01
Capture
Take one photo of your log pile directly on site.
Built for Lumber Yards & Sawmills
LumberCounter is a lumber counting app and log counting app for field teams. Use your phone as a timber counter to detect log ends, review results, and keep faster lumber tally records on site.
Designed for real log and lumber counting workflows, not generic object counting.
01
Take one photo of your log pile directly on site.
02
The app detects and counts log ends automatically across lumber and timber piles.
03
Save and share counting results with your team.
Capture long panoramic stacks in one shot. As a camera log counter, LumberCounter splits the panorama into smart zones, detects log ends section by section, and removes edge duplicates to keep counts accurate at scale.
Every counting record can include an on-photo stamp with time, location, and total logs. Keep trusted field evidence for handoff, audit, and reporting.
It is a dedicated lumber counting app and log counting app built for woodpile workflows.
Yes. It is optimized for wide panoramas with zone-based detection and duplicate-edge cleanup.
Yes. You can save stamped photos with time, location, and count details for reporting and audit trails.
No. LumberCounter is currently being built for iOS only.
Use LumberCounter on site to count faster, reduce manual errors, and keep verifiable records in every job.